  • Technical support for the appointed inspector ("Prüfbeauftragter") for a research platform.
  • Development of an innovative concept of floating wind turbines for a project planner.
  • Load analysis for existing towers for upgrading.
  • Large number of block transports, each with frame and sea fastening.
  • Dimensioning and testing of project cargoes on hatch covers.
  • Implementation of tower designs for a well-known system manufacturer.
  • Design of a reusable seafastening frame
  • Feasibility and cost study cellular radio within the North Sea (German only)

 