2019

  • Strengthening a grout connection with installation deviations. Recalculation of the foundation structure of the associated transformer station.
  • Technical support for the inspector for a project after a damage case.
  • Development of a floating wind turbine for a Japanese project planner.
  • Large number of block transports for new ships, each with frame and sea fastening.
  • Implementation of tower measurements for a well-known system manufacturer.

 

Note: For the evaluation of incidences and latest technical developments, we regret that we are unable to provide visual material to illustrate these services.