2015

  • Design of a tripod for a turbine 8MW turbine MHI Vestas V164 and presentation at Windforce 2015.
  • Re-dimensioning of a boat landing for a third party considering offshore welds.
  • Design of a monopile for 30m water depth and for a turbine size from 6 to 8MW.
  • Retrofit for fixing lost gratings.
Monopile preliminary design example