• Design of steel tower and supervision of the entire structure (steel-concrete hybrid tower) for Multibrid turbines M5000 at locations 3 and 4.
  • Preparation of the Design Basis for the offshore project Nordsee Ost on behalf of Essent.
  • Start of design for six Tripods for the first German offshore wind farm Alpha Ventus on behalf of Multibrid GmbH.
  • Design of 21 Tripods for the French offshore project Côte d’Albâtre on behalf of PROKON Nord Energiesysteme GmbH.
  • Preparation of Design Basis and Preliminary Design (tripod) for the offshore wind farm Global Tech I on behalf of the Norderland Group.